SFA Domes · Dammam · 2022

Two Domes. Many Sports. One Prestigious Client.

Client

Ministry of Sports

Practice

Design + Build

Footprint

2 × 8,000 m²

Status

Operating · 2022

The brief

Build world-class indoor football infrastructure in Dammam on a timeline that steel construction cannot meet. Air-supported dome technology changed the equation. We wrote the sport programming brief before the structural drawings were issued, then built and ran all three.

The approach

Three decisions that made the timeline possible.

01

Structure follows sport

Most venues are designed by architects and handed to operators. We wrote the sport programming brief first. Court dimensions, ceiling clearance, floor surface, all locked before the structural package was issued.

02

Air-supported from the ground up

Conventional steel structures take 18 to 24 months minimum. Air-supported technology cut that to under nine months without compromising surface quality or environmental control. The buildings inflate. The programming does not have to wait.

03

Opening-day operations

Leagues were registered before ribbon-cutting. Members showed up to a venue with a full schedule, not an empty hall looking for ideas. We ran the first fixture the week the domes opened.
Domes built
0
Cities Across KSA
0
Sports on the schedule
0 +
Weekend utilization
0 %

Testimonial

"Duplays didn't just design AllSports Arena. They taught us how to run it — and then they did, for the first 18 months."

Partner, AllSports Arena

Dubai, United Arab Emirates